Phone
Website
Technopromexport is implementing the construction of base-load generation facilities, the Sevastopol and Simferopol CCGT power plants.
The commissioning of the Sevastopol and Simferopol CCGT power plants will ensure the required level of reliability and meet the projected growth in demand of the Crimean Peninsula:
— the commissioning of the first phase will provide the Crimean energy system with a capacity of 470 MW;
— the commissioning of the second phase will provide the Crimean energy system with a capacity of 940 MW.